- Hide menu

plum tuckered

My wife and I have spent close to 45 hours on the tile work in the bathroom and it’s nearly complete. The walls a 2″ by 4″ marble subway tiles and the accent tiles are glass and natural stone. The grouting will be absolute hell because of the small tiles. I’ll take some closer shots of the accent tiles on of these days.  Here’s a photo from about 5 days ago.

We’re plum tuckered out.

I bought a Canon lens mount for my Sony, so I attached my Canon 10-22 wide angle zoom to get the whole bath tub.

tiles

 

 

5 thoughts on “plum tuckered

  1. TexWisGirl says:

    i’d be drinking heavily. or curled up in the tub and crying my eyes out. or both. 🙂

  2. That’s AWESOME. and a heck of a lot of work I’m sure. Love it, and so timely as my wife and I are trying to come up with ideas to re-do our master.

  3. RuneE says:

    Both the bath and the mount seem to be working well

  4. Rajesh says:

    Nicely done.

  5. It looks very grand! So when am I expecting you for the second round? :p